Working on the yard Day 6 through 13





Although there are no pictures to document the processes listed below is what occurred during Day 6 to Day 13:

Day 13 - Work continued on finishing the bushes on the outside wall of the west side and the cleaning of brush from the west side yard, trip to dump
Day 12 - Continued to trim bushes on the outside west wall, trip to dump
Day 11 - Cleaned west side of drive way and leveled it, discovered cable to back valves was not operational for both valves
Day 10 - Cleaned west side of driveway and cut elm bushes just northwest of driveway, trip to dump
Day 9 - Continued levelling of front yard and obtaining parts to fix valves and heads
Day 8 - Continued cleaning and leveling back and side yards, trip to dump
Day 7 - Leveled back and east side yards
Day 6 - Cleaned back yard of more roots and sticks and began levelling, took load to dump